Friday, November 25, 2005

Slow, but sure...


Installed an electric panel and new meter box. The lots have a water well and 2 septic tanks already. When we get electricity to the place, we can get the well pump running and it'll be suitable for camping. I plan to put a 5th wheel trailer on there to start with, so we'll have a place to shower, and sleep. Then we can spend more time working on the land, pier, etc. There's a concrete slab we want to build a cover over for a picnic table and bbq pit!
There's still some remaining of the three trailers that used to be there. They should be gone in a couple of weeks.

Tuesday, November 22, 2005

Lots are shaping up!




My wife's family owns some lots at the lake. We've been working, trying to clear them off so we could start using them for weekend get-aways, and vacations. Hired a guy to run a dozer and clear the brush. He even dozed the 3 junk trailers that were sitting there. His boys are selling the scrap metals for some extra cash and that saves us the trouble of hauling the stuff off.